二区三区avI免费精品视频在线观看I色一色在线I国产精品一区二区精品视频免费看I国产超碰在线观看I97在线观看免费视频

MALL

TEL:0537-2658289

  • 網站首頁
  • 公司簡介
  • 產品展示
  • 行業用途
  • 新聞中心
  • 視頻展示
  • 案例展示
  • 聯系我們
  • Jining Xinxin Ultrasonic Electronic Equipment Co., Ltd.

    Products-Xinxin Ultrasound

    —— 客戶滿意是我們的追求 ——

    Customer satisfaction is our pursuit

    Fully automatic ultrasonic spray drying and cleaning system equipment

    Release time:2025-6-11    Reading volume 335 second
    Reading guide:Fully automatic ultrasonic spray drying and cleaning system equipment

    17193062005930769

    I
    ntroduction
    Detailed parameters


    (01) Set various parameters for equipment operation through the touch screen on the device. The operator manually places the workpiece into the cleaning fixture basket and places it at the feeding station. The motor drives the conveyor chain to automatically drive the fixture basket into the sensing area and enter the working state; Internal automatic positioning is used in conjunction with a robotic arm to grab the fixture basket, which enters the spraying, jetting, and emptying stations (cleaning solution: municipal water+degreaser). After the fixture basket reaches the cleaning station, the running device stops and the high-pressure spraying device starts working, starting high-pressure spraying cleaning. The nozzle is set above and on the side of the tank, and the liquid is thoroughly filtered before rinsing the workpiece during spraying cleaning. During the flushing process, add liquid to the tank until the specified liquid level is reached. Then, turn on the jet nozzle, which is located at the bottom and side of the tank. The jet flushing method uses a mixture of gas and liquid, and the jet nozzle can effectively remove stubborn dirt from the inner cavity and surface of the workpiece. After the underwater jet cleaning is completed, the workpiece is lifted and transported to the next process by the robotic arm. All the liquid in the tank is discharged to the storage tank, and the liquid is reused after full filtration.

    → (02) After spraying, jetting, and emptying, the workpiece is grabbed by a robotic arm and enters the ultrasonic degreasing and rough washing station. The fixture basket is immersed in the tank for ultrasonic degreasing and rough washing (cleaning solution: municipal water+degreasing agent); The ultrasonic rough cleaning adopts an immersion ultrasonic vibration plate structure, which is installed at the bottom of the tank. The ultrasonic frequency is 28KHz, which can better clean the stains on the surface of the workpiece. The ultrasonic cleaning tank adopts a fast discharge structure, which can set the emptying time through the program. The ultrasonic cleaning tank is equipped with a turbulence device, mainly for cleaning the inner cavity and inner hole;

    After ultrasonic rough washing, the workpiece is grasped by a robotic arm and enters the ultrasonic degreasing and finishing washing station. The fixture basket is immersed in the tank for ultrasonic degreasing and finishing washing (cleaning solution: municipal water+degreasing agent); Ultrasonic precision cleaning adopts an immersion type ultrasonic vibration plate structure, which is installed at the bottom of the tank. The ultrasonic frequency is 28KHz to further clean the residual stains on the surface of the workpiece; The ultrasonic cleaning tank adopts a fast discharge structure, which can set the emptying time through the program. The ultrasonic cleaning tank is equipped with a turbulence device, mainly for cleaning the inner cavity and inner hole.

    After ultrasonic degreasing and precision cleaning, the workpiece is grasped by a robotic arm and enters the spraying, jetting, and emptying station (cleaning solution: municipal water+degreasing agent). After the fixture basket reaches the cleaning station, the operating device stops and high-pressure spraying cleaning begins. The nozzle is set above and on the side of the tank. During spraying cleaning, the liquid is thoroughly filtered before rinsing the workpiece. During the flushing process, add liquid to the tank until the specified liquid level is reached. Then, turn on the jet nozzle, which is located at the bottom and side of the tank. The jet flushing method uses a mixture of gas and liquid, and the jet nozzle can effectively remove stubborn dirt from the inner cavity and surface of the workpiece. After the underwater jet cleaning is completed, the workpiece is lifted and transported to the next process by the robotic arm. All the liquid in the tank is discharged to the storage tank, and the liquid is reused after full filtration.

    → (05) After spraying, jetting, and emptying, the workpiece is grabbed by a robotic arm and enters the ultrasonic rinsing station to undergo ultrasonic rinsing (cleaning solution: municipal water+degreaser); The ultrasonic rinsing adopts an immersion ultrasonic vibration plate structure, which is installed at the bottom of the tank. The ultrasonic frequency is 28KHz, which can completely remove residual liquid on the workpiece and improve the cleanliness of the workpiece surface. The ultrasonic cleaning tank adopts a fast discharge structure, which can set the emptying time through the program. The ultrasonic cleaning tank is equipped with a turbulence device, mainly for cleaning the inner cavity and inner hole.

    After ultrasonic rinsing, the workpiece is gripped by a robotic arm and enters the spraying, jetting, and emptying stations (cleaning solution: municipal water+rust inhibitor); After the fixture basket reaches the cleaning station, the operating device stops and high-pressure spray cleaning begins. The spray nozzle is set above and on the side of the tank. During the spray cleaning, the liquid is thoroughly filtered before rinsing the workpiece. During the flushing process, add liquid to the tank until the specified liquid level is reached. Then, turn on the jet nozzle, which is located at the bottom and side of the tank. The jet flushing method uses a mixture of gas and liquid, and the jet nozzle can effectively remove stubborn dirt from the inner cavity and surface of the workpiece. After the underwater jet cleaning is completed, the workpiece is lifted and transported to the next process by the robotic arm. All the liquid in the tank is discharged to the storage tank, and the liquid is reused after full filtration.

    → (07) After spraying, jetting, and emptying for rust prevention, the workpiece is grabbed by a robotic arm and enters the mobile wind cutting station with a clamp basket; This workstation adopts a mobile air blower and a high-pressure fan. An air blower is installed inside the tank, and the air nozzle can quickly dry the residual moisture on the surface of the workpiece.

    → (08) The workpiece is subjected to high-pressure fan mobile reciprocating water cutting+fan filtered hot air pre drying, and then the mechanical arm grabs the fixture basket and enters the vacuum drying station. When the workpiece reaches the designated position, the upper cover automatically closes, and the station is sealed before vacuum drying; The vacuum drying station is equipped with a vacuum buffer tank, which can effectively shorten the vacuuming time and maintain the stability of the vacuum.

    After the vacuum drying is completed, the upper cover is automatically opened, the mechanical arm grabs the fixture basket, and the motor drives the conveyor chain to automatically drive the fixture basket into the induction area, automatically positioning and transporting it to the unloading station. The operator manually takes out the product from the fixture. (The cleaning stations are arranged in a straight line, with left in and right out, and an automatic basket return line (manual loading and unloading) is set in front of them. The overall layout is in a zigzag shape, and the operators manually load and unload the materials at the first position or adjacent to each other. The overall equipment layout diagram has been approved by the bidding party.)


    I
    ntroduction
    Detailed display


    17193062222098188

    17193062302963361

    17193062398420820

    17193062476001768

    Fully automatic ultrasonic spray drying and cleaning system equipment
    Previous:Wheel hub continuous pass cleaning machineNext:Wheel hub continuous pass cleaning machine

    Contact us

    Jining Xinxin Ultrasonic Electronic Equipment Co., Ltd.  
    Address:High-tech Development Zone, Jining City, Shandong Province
    Postcode:272000  
    Landline:0537-2658289

    Please transfer the extension number to the business department 801.802.803.804
    Phone:15910013420  
    Contact: Lin Manager  
    Fax:0537-2658089-805  
    E-mail:xxchaosheng@163.com  
    Web:www.0734zkw.com

    Wechat consulting

    Wechat consulting

    Top 主站蜘蛛池模板: 91av99| 在线91色 | 久久久精品国产免费观看同学 | 天天操操 | 人人爱在线视频 | 国产成人黄色网址 | 国产一区二区电影在线观看 | 91激情视频在线观看 | 国产精品乱码高清在线看 | 中国一级片在线观看 | 黄色三级免费网址 | 国产精品美女视频 | 免费a v观看 | 亚州精品天堂中文字幕 | 国产成人av网 | 国产精品成人免费 | 草草草影院 | 国产高清成人av | 久久社区视频 | 色婷婷综合久久久久中文字幕1 | 久久精品一区二区三区四区 | 在线天堂日本 | 免费精品国产 | 国产又粗又硬又长又爽的视频 | 欧美伦理电影一区二区 | 一级免费黄色 | 精品国产精品国产偷麻豆 | 色婷婷啪啪免费在线电影观看 | 蜜臀一区二区三区精品免费视频 | 亚洲综合视频在线播放 | 日韩成人欧美 | 99精品视频在线看 | 国产美女在线精品免费观看 | 美腿丝袜av | 久久综合免费视频影院 | 免费看的视频 | 成人黄色电影在线观看 | 天天色天天爱天天射综合 | 日韩视频在线观看视频 | 日韩欧美在线国产 | 粉嫩一区二区三区粉嫩91 | 欧美99热 | 国产成人精品福利 | 日韩羞羞| 国产精品日韩久久久久 | 日本精品一区二区三区在线观看 | 国产精品成人久久久 | 天天草天天草 | 国产在线观看午夜 | 欧美激情视频在线观看免费 | 欧美a在线看 | 成人精品99 | 在线91观看| 久久免视频 | 伊人午夜视频 | 欧洲视频一区 | 国内精品久久久久久久影视麻豆 | 绯色av一区 | 欧美日韩国产二区三区 | 亚洲精品黄网站 | 97电院网手机版 | 99久久精品免费看 | 久久ww | 草久久精品 | 99久久久成人国产精品 | 最近中文字幕完整高清 | 国内精品久久久久影院一蜜桃 | 亚洲成人av在线播放 | 成人av电影免费在线播放 | a亚洲视频 | 精品久久国产一区 | 久久国产成人午夜av影院宅 | 国产精品久久一 | 久久久久网址 | 91精品国产一区二区在线观看 | 在线观看日韩视频 | 欧美最猛性xxxxx免费 | 在线观看国产亚洲 | 九九视频精品免费 | 丁香六月久久综合狠狠色 | 丁香六月伊人 | 国产精品18久久久久久久久久久久 | 一区二区三区四区五区六区 | 国产区在线视频 | 欧美日在线观看 | 久久99亚洲精品久久久久 | 国内精品久久久精品电影院 | 国产在线欧美 | 国产免费资源 | 91亚洲精品乱码久久久久久蜜桃 | 日韩高清在线不卡 | av电影免费在线看 | www.av在线播放| 在线观看免费国产小视频 | av免费电影在线 | 欧美精品v国产精品 | 91福利社区在线观看 | 日韩超碰在线 | 青青草国产精品视频 |